Prism Safety
Contact Prism Safety on +44 (0)7841 433 030
Login
  • Home
  • About Us
    • About Prism Safety
    • Management Team
    • Safety Regulation
  • Solutions
    • Risk Management
    • Clients
      • Case Study
      • Testimonials
    • Business Sectors
  • Product
    • PRISM Software features
    • How to use PRISM
    • How To Buy
  • Support Services
    • Consultancy Services
    • Training
    • Information Centre
      • FAQs
      • Essential Downloads
      • Request A Callback
    • Links
    • Press Releases
    • Events and webinars
  • News
  • Contact
  • About Prism Safety
  • Management Team
  • Safety Regulation

Want to try Prism for yourself?

Request A Callback

Client Testimonials

We would like to congratulate the team at Prism Safety for an excellent product

Andrew Edmondson
Vulcan to The Sky Trust UK

Client testimonials

  • Home
  • About Us
  • Safety Regulation

Safety Regulation

With the introduction of safety regulation and the requirement for comprehensive Safety Management Systems (SMS) by the International Civil Aviation Organisation (ICAO) by January 2009, a large number of International Aviation Authorities relaxed the full implementation date on the proviso that operators could be "seen to be working towards" implementation, with a requirement to show full implementation in or around early 2011.

This was to allow Air Operators Certificate holders the time to either create their own system internally or alternatively, research the market for suitable "off the shelf" systems.

We are currently approaching the half way mark of this "grace" period and are therefore seeing an upsurge in interest in commercially available SMS products.

Any operator who has tried to implement a fully functional and effective SMS from scratch will know the significant amount of resource that has to be allocated if it is to be done properly. These resources include, additional staff, hundreds of man hours in system design and development, purchase of hardware to assist in the running of the system, training of those who will be required to use the system regularly and finally expensive consultancy services to ensure that what you are creating meets regulatory requirements. All this takes valuable company personnel away from the core needs of the business.

With the purchase of the Prism-Safety SMS software, all the above is taken care of and once purchased, an organisation can be fully operational on the system within a period of less than 2 weeks, with the satisfaction of knowing that all regulatory requirements will be met with no additional investment other than the product itself. If one adds to that the significant advantages of a professionally designed effective and pro-active system, the savings in future costs, which are difficult to predict and quantify, have the potential to be significant, if the system is properly utilised.

Top of page

Copyright © 2012 Prism Safety. All Rights Reserved. Website Design by Space Worldwide

  • Home
  • Terms Of Use
  • Accessibility
  • Privacy Policy
  • Site Map